Analisis Rencana Anggaran Biaya Pekerjaan Pembangunan Pemecah Gelombang (Breakwater) Pantai Maligano, Desa Raimuna, Sulawesi Tenggara

Authors

  • Risdayatul Ningsi Universitas Halu Oleo
  • Uniadi Mangidi Universitas Halu Oleo
  • Januar Saleh Kaimuddin Universitas Halu Oleo
  • Fathur Rahman Rustan Universitas Sembilanbelas November Kolaka https://orcid.org/0000-0002-7329-6450

Keywords:

Cost Budget Plan, Breakwater, Work Volume, RAB

Abstract

The Cost Budget Plan (RAB) is an estimate of the monetary value of an activity (project) that has taken into account the bestek drawings, work plans, wage lists, material price lists, analysis books, cost plan composition lists, and lists the amount of each type of work. The purpose of this study is to determine the total Budget Plan Cost (RAB) required on bending layer work, core layer work, main layer work, protective layer work, left-right foot protection work. The method used in this final project uses the water resources (SDA) method and uses the Excel 2010 application. The results of this study include the total cost budget of the main layer work Rp. 152,757.45, the total cost budget of the work on the main layer Rp. 611,809.15, the total cost of work on the protective layer Rp. 2,342,114.84, the total cost of work on the protective layer of left and right feet Rp. 611,809.16, and the total cost of work on earthworks amounted to Rp. 160,367.00. The total cost of work after being multiplied by the amount of 15% VAT on the construction of the 250 metre Maligano Beach Breakwater is Rp. 4,509,700,000, - (Four Billion Five Hundred Nine Million Seven Hundred Thousand Rupiah).

Downloads

Published

01-06-2024

Issue

Section

Articles